To do certified payroll, a contractor gathers each worker’s classification, hours, wages, fringe benefits, deductions, and identifying information, submits the weekly payroll record to the designated agency, and signs a Statement of Compliance confirming the record is accurate.

On Davis-Bacon and Related Acts projects, certified payroll is an additional weekly filing alongside the contractor’s ordinary payroll process. This guide focuses on the workflow for contractors and subcontractors working on federally funded or federally assisted construction contracts. For the broader reporting framework, see ProScore’s certified payroll reporting guide.

Book a demo

What should contractors confirm before preparing certified payroll?

Before preparing the first weekly record, confirm that the contract contains Davis-Bacon labor standards, identify the agency or designated recipient that receives submissions, and collect the wage determinations and payroll-period rules named in the contract. The contracting agency’s instructions control the delivery method and any additional fields.

Q: Is Form WH-347 required for every certified payroll?

A: Form WH-347 is an optional format. The contractor still must submit the required weekly payroll information and signed Statement of Compliance in the format accepted by the contracting agency. The U.S. Department of Labor’s WH-347 instructions explain the fields and an accepted alternative format.

Step 1: How do you gather employee work classifications?

Start with the work each person actually performed during the payroll period, then compare that work with the classifications in the applicable wage determination. A job title from a timekeeping or HR system can provide context, but the duties performed on the covered project drive the classification review.

  1. List every laborer, mechanic, and registered apprentice who performed covered work during the period.
  2. Match the duties performed to the applicable labor classification and confirm the project location.
  3. Record the wage determination number and revision that supports the classification.
  4. Check whether a worker performed more than one classification and allocate hours accordingly.
  5. Keep support for classification decisions, including supervisor review and any agency direction.

Registered apprentices need additional review. Confirm the apprenticeship program, registration status, applicable apprentice classification, and ratio requirements before applying an apprentice rate. When the work falls outside the listed classifications, pause the submission and request direction from the contracting agency or the appropriate labor standards contact.

A classification error can flow into the basic wage, fringe calculation, overtime premium, and Statement of Compliance. Treat classification as a source record that downstream payroll checks reference each week.

Step 2: How do you calculate gross wages and fringe benefits?

Calculate wages from the applicable wage determination, the worker’s classification, hours by day, and the fringe-benefit obligation. The required prevailing wage generally combines a basic hourly rate with a fringe-benefit amount. A contractor can satisfy the fringe obligation through qualifying benefit contributions or cash paid in lieu of benefits, subject to the applicable rules.

Payroll input What to verify Record in the weekly file
Classification Work performed matches the wage determination Classification and determination reference
Hours Daily hours, weekly total, and covered-contract hours reconcile Hours by day and total hours
Basic wage Rate meets the applicable determination Hourly basic rate and gross pay
Fringe benefits Benefit credit or cash equivalent is supported Fringe rate, contribution, or cash amount
Deductions Each deduction is permitted and documented Deduction type and amount

Separate straight-time and overtime calculations when the contract and applicable law require overtime. For a covered contract subject to CWHSSA, the overtime premium is generally one and one-half times the basic rate for hours over 40 in a workweek. The fringe component is handled according to the applicable DOL guidance and wage determination. The DOL Davis-Bacon compliance principles provide examples of basic rates, fringe benefits, and overtime treatment.

Reconcile the certified payroll values to the ordinary payroll register before submission. Check that gross wages, fringe amounts, deductions, net pay, and the hours assigned to the covered contract agree with the source records. Store documentation for benefit-plan contributions and cash-in-lieu calculations with the weekly payroll package.

Step 3: How do you complete the WH-347 form line by line?

Complete the WH-347 using the project, contractor, wage-determination, worker, hours, rate, deductions, and payment information gathered in the first two steps. The form is a convenient submission format, while the underlying certified payroll information and weekly certification remain the controlling obligations.

  1. Project header: Enter the project name, project or contract number, location, county, reporting period, contractor or subcontractor identity, and prime-contract details requested by the form.
  2. Wage determinations: List the applicable determination number or numbers and revisions. Include every determination used for the workers reported for that period.
  3. Payroll number: Number weekly submissions sequentially, beginning with 1. Identify the final payroll when the form covers the last week of the contractor’s work.
  4. Worker rows: Enter each worker’s name and identifying number, classification, hourly rates, daily hours, total hours, gross wages, fringe information, deductions, and net wages.
  5. Review: Compare every row with timekeeping, payroll, classification, and benefit records. Resolve missing, conflicting, or unusual values before certification.

The DOL’s annotated WH-347 instructions are the best reference for the exact field sequence. Follow the contracting agency’s instructions when its submission portal or template requests information beyond the standard form.

Use a controlled review process for multi-contractor projects. A prime contractor should know which subcontractor payrolls are due, which have passed review, which need corrections, and which are ready for delivery. A simple status register reduces missed submissions and makes follow-up ownership clear.

Teams evaluating certified payroll software can use the Solutions page as a practical starting point.

Q: What information belongs in certified payroll?

A: Certified payroll generally identifies each covered worker, the work classification, hourly wage and fringe rates, daily and weekly hours, deductions, and actual wages paid. The weekly payroll is paired with a signed Statement of Compliance. The contract and agency instructions may require additional project or worker details.

Step 4: How do you sign the Statement of Compliance?

Sign the Statement of Compliance after reviewing the completed weekly payroll and confirming that the reported workers received the required wages and fringe benefits for the work performed. The signer should be the contractor, an authorized official, or an agent who paid or supervised payment for the covered period.

Certification creates an accountability step, so it belongs after review rather than at the start of data entry. Keep the signed statement with the corresponding weekly payroll and supporting records.

Step 5: When do you submit certified payroll to the contracting agency?

Submit certified payroll weekly to the contracting agency or other designated recipient within seven days after the regular payment date for the payroll period. The deadline runs from the regular payment date, rather than from the end of the workweek. Use the delivery method specified in the contract or agency instructions, and retain confirmation that the submission was received.

  1. Close the weekly payroll period and complete the ordinary payroll run.
  2. Reconcile time, classifications, rates, fringe benefits, deductions, and payments.
  3. Complete the certified payroll form or agency-approved equivalent.
  4. Sign the Statement of Compliance using an accepted signature method.
  5. Submit the package by the required deadline and retain the receipt, confirmation, or portal record.
  6. Track corrections, resubmissions, and agency questions against the original payroll number.

The DOL Employment Law Guide states the weekly data elements and the seven-day timing rule. The DOL construction FAQ also explains that weekly certified payrolls go to the funding recipient within seven days of the regular pay date.

What common certified payroll mistakes should contractors avoid?

The most common mistakes occur when teams treat certified payroll as a form-filling exercise instead of a controlled weekly reconciliation. Build a review checklist around the source records and the contract’s delivery rules.

For an IRA or OBBB project, the taxpayer’s wage-and-hour records should remain audit-ready for IRS examination. The weekly certified payroll filing described in this guide applies to Davis-Bacon-covered work, unless the project contract separately requires a certified payroll submission. The IRS explains that meeting IRA prevailing wage and apprenticeship requirements can increase certain credit or deduction amounts by 5 times and requires specific supporting records. Keep the two evidence tracks connected in project governance while preserving their distinct filing rules.

How can ProScore help teams manage certified payroll?

A missed classification or a late weekly submission does not just cost time. It puts back wages, contract withholding, and debarment on the table, and on IRA and OBBB projects it puts the tax credit itself at risk. ProScore gives compliance managers one system of record for every classification, hour, rate, fringe calculation, and correction, across every contractor and every project, so nothing reaches a contracting agency or an IRS exam unverified.

Multi-contractor projects are where certified payroll breaks down: dozens of weekly payrolls, dozens of deadlines, no single view of who is done, who is late, and who needs a correction. ProScore’s dashboards give project teams that view in real time, and automated reporting turns a weekly scramble into a repeatable, audit-ready process. The same records that support this week’s WH-347 also support the prevailing wage and apprenticeship evidence owners, EPCs, and capital providers need across the life of the project.

For the broader cluster context, review prevailing wage record-keeping requirements and the guide to prevailing wage fringe benefits. These related resources cover record retention and fringe-benefit detail without replacing the weekly certified payroll workflow described here.

Book a demo

Certified payroll FAQs

How often do contractors submit certified payroll?

Contractors generally submit certified payroll weekly on Davis-Bacon-covered work. The submission is due within seven days after the regular payment date for the payroll period, unless the contract or agency instructions establish a stricter process. Confirm the recipient and delivery method in the contract before the first submission.

Can a contractor use payroll software to prepare certified payroll?

Yes. Payroll software can support certified payroll preparation when it preserves the required worker, classification, hours, wage, fringe, deduction, payment, and certification data. The contractor remains responsible for reviewing the output against the wage determination, project records, contract terms, and agency instructions before signing.

Does certified payroll replace regular payroll?

No. Certified payroll is an additional weekly reporting step for covered work. The contractor runs ordinary payroll, then prepares and submits the certified payroll record with the required Statement of Compliance. The two records should reconcile so reported hours, wages, benefits, deductions, and payments agree.

What happens when a certified payroll contains an error?

Correct the source record, document the correction, and follow the contracting agency’s resubmission process. Keep the original payroll number, correction details, revised certified payroll, and agency correspondence together. Escalate classification or wage questions to the agency or labor standards contact before certifying an unresolved record.

Do IRA projects always require weekly WH-347 filings?

No. WH-347 is associated with Davis-Bacon and Related Acts certified payroll reporting. IRA projects have separate prevailing wage, apprenticeship, and recordkeeping requirements for taxpayers claiming increased incentives. Review the project’s funding terms and tax-credit requirements, then preserve audit-ready wage-and-hour records even when a weekly WH-347 filing is absent.